.jpg)
.jpg)
We did a temporary repair to this pipe while the bidding for the repair work was being negotiated.
.jpg)
.jpg)

.jpg)

To this:

Dave Hancock of Paumalu Electric was awarded the contract

Unit 401 wiring begins on the left facing the panels

.jpg)
.jpg)

I then coated the pipes with a cold galvanizing compound for further protection.
.jpg)
Here is a look at the inside of the transformer box by the dumpster.
No comments:
Post a Comment