Friday, October 1, 2010

Electrical Panel Boxes

We went from this:













We did a temporary repair to this pipe while the bidding for the repair work was being negotiated.






To this:













Dave Hancock of Paumalu Electric was awarded the contract






Unit 401 wiring begins on the left facing the panels













I then coated the pipes with a cold galvanizing compound for further protection.












Here is a look at the inside of the transformer box by the dumpster.

No comments: