We went from this:
We did a temporary repair to this pipe while the bidding for the repair work was being negotiated.
To this:
Dave Hancock of Paumalu Electric was awarded the contract
Unit 401 wiring begins on the left facing the panels
I then coated the pipes with a cold galvanizing compound for further protection.
Here is a look at the inside of the transformer box by the dumpster.
Friday, October 1, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment