Bldg B Resheathing and Bldg A completes 11/11/08
This is the completed Building A 11/11/08. This picture is taken from the parking lot, Mauka side. Only my office is left to complete.
More Makai side shots Building A
Roofing over 311 Makai side shots Building A
Step flashing detail
More step flashing detail
Step flashing detail
Building B was originally installed with 1/2" plywood. Tory's is re-sheathing the building beginning over Mauka side Unit 405-406 North End with another layer of 1/2" plywood. And as discussed in our pre-con meeting this morning all sheets are to be stagger-lapped on the preceeding deck and all sheets are to start and stop on a rafter. There is to be no open field nailing.
Here is a look at the copper facia drip edge as it wraps into the gutter.
Here is a look at the makai side gutter of Building B (before it has been finally cleaned) and showing the straight coursed and a close up look of what the roof looks like from this vantage point
Another look at the roofing as seen from the ladder.
See inspection reports for the accurate full details of how the roof was installed.