Thursday, September 25, 2008

Roofing Building B begins 9-25-08 and is Completed 10-3-08



This is the roof over Unit 606.


This is the siding where the step flashing was installed


This was what that section looked like after the step flashing was installed.


This is the completed roof as seen from the third floor Building A


This is a close up of what the shingle looks like installed


This is the quality of roofing we got from Tory's Roofing.


This is what the ridge looks like before the ridge vents get installed.

Here is the uninstalled roof vent

Here is after the roof vent is installed

Here is a pipe flashing completed


Here Tory's crain is hooked to a drop bucket filled with rubbish. It is carefully placed on the roof so that the rubbish will not have to be thrown down from the roof to the grounds. During high winds this would have made a mess for cleanup as well as a nightmare for the tenants.



He lowers the rubbish bucket into the truck for a safe landing.


Can you imagine the frustration for the tenants if Tory's had used a shoot to lower the rubbish or worse yet, if he'd have not used any form of rubbish protection? The shoot would have blocked the view of our tenants for the last 2 weeks. Tory's crews were very professional. They knew how to use the equipment and worked to respect our tenants during the whole roofing process. I could not find any way they could have done a better more respective job. Their clean up was done daily and was without issue.


Roofing begins on Building B today with blue skies and moderate trades.